ultrafine vertical roller mill installation in production line

The company developed and produced the series are respectively LUM ultrafine vertical roller mill and  LM vertical roller mill, the two products can be ground there are many types of materials, but also because it is the fineness of the powder material obtained after grinding materials moderate fineness, in many industries It has applications in the field, so ultrafine vertical roller mill  in mine milling industry use more widely. Especially recently, the company has designed vertical milling machine set up coal mill, coal-fired domestic enterprises more, so demand for coal mill led to more extensive use of vertical milling machine.

Extensive use of vertical roller mill has also brought some new users needs, such as mill installation, maintenance, testing, etc., but some of the issues the following vertical milling machine for milling production line during the installation process need to pay attention to simple instructions.

First, the mill production equipment is installed on a concrete foundation, each device needs to use the base and concrete foundation fixed, in order to prevent any surprises during the production process, and therefore the first to be built in front of the installation base. In addition, the basic construction needs in accordance with the design requirements of the production line to build, we need to leave some space around the foundation and operation of the machine fault repair space, and the other, but also for some of the lifting apparatus, maintenance device settings such space.

Second, install the machine in strict accordance with the installation diagram and installation drawing machine production line to carry out, and to ensure that fixed spindle machine after keeping vertical and horizontal planes, and this demand also requires the user to the surface of the base level of polish.

Once again, after Host installed, after the other devices are installed, to adjust the size of the vertical distance between the roller mill and the disc between the general control of the spacing between three millimeters to eight millimeters. In addition to other devices outside the mill and the host needs to keep the inlet and outlet agreement, which is to ensure a smooth production line out of material.

Finally, after installation, you need to check the cabinet there step by step, to ensure that the machine, circuit and so correct. Once installed, you can try the best run for some time, about an hour, during this time you can make vertical mill idling to pilot production line is intact.